{"id":618,"date":"1999-01-21T13:11:11","date_gmt":"1999-01-21T12:11:11","guid":{"rendered":"http:\/\/www.gip-ecofor.org\/gicc\/?p=618"},"modified":"2018-11-21T13:11:30","modified_gmt":"2018-11-21T12:11:30","slug":"mecanismes-de-developpement-propre-politiques-et-mesures-domestiques","status":"publish","type":"post","link":"http:\/\/www.gip-ecofor.org\/gicc\/?p=618","title":{"rendered":"M\u00e9canismes de d\u00e9veloppement propre, politiques et mesures domestiques"},"content":{"rendered":"<h1 class=\"title\">M\u00e9canismes de d\u00e9veloppement propre, politiques et mesures domestiques<\/h1>\n<div class=\"tabs\"><\/div>\n<div id=\"node-126\" class=\"node odd full-node node-type-projet_de_recherche\">\n<div class=\"meta\"><\/div>\n<div id=\"content-middle\">\n<div class=\"block-wrapper odd\">\n<div id=\"block-attachment_block-attachment_bloc\" class=\"block block-attachment_block \">\n<div class=\"content\">\n<table id=\"table_piece_jointe\" class=\"sticky-enabled sticky-table\">\n<tbody>\n<tr>\n<th>Fichier(s) attach\u00e9(s)<\/p>\n<hr \/>\n<\/th>\n<\/tr>\n<tr>\n<td>\n<ul>\n<li class=\"ppt\"><a href=\"http:\/\/www.gip-ecofor.org\/doc\/drupal\/gicc\/diapos299.ppt\" target=\"_blank\" rel=\"noopener\">Pr\u00e9sentation ppt<\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ul>\n<li class=\"pdf\"><a href=\"http:\/\/www.gip-ecofor.org\/doc\/drupal\/gicc\/2-99KarsentyRF.pdf\" target=\"_blank\" rel=\"noopener\">Rapport final <\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ul>\n<li class=\"pdf\"><a href=\"http:\/\/www.gip-ecofor.org\/doc\/drupal\/gicc\/2-99KarsentyResumeRF.pdf\" target=\"_blank\" rel=\"noopener\">Rapport final r\u00e9sum\u00e9<\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"content\">\n<p>L&rsquo;utilisation des m\u00e9canismes de d\u00e9veloppement propre pour le financement d&rsquo;un certain nombre de projets de \u00a0\u00bb puits de carbone \u00a0\u00bb dans le secteur forestier pose des probl\u00e8mes m\u00e9thodologiques d&rsquo;\u00e9valuation li\u00e9s aux conditions restrictives \u00a0\u00bb d&rsquo;additionnalit\u00e9 \u00a0\u00bb (additionality) et de \u00a0\u00bb d\u00e9perdition \u00a0\u00bb (leakage) mentionn\u00e9s dans le protocole de Kyoto.<br \/>\nCes strictes conditions d&rsquo;\u00e9ligibilit\u00e9 font appara\u00eetre tous les enjeux attach\u00e9s \u00e0 la construction de \u00a0\u00bb sc\u00e9narios de r\u00e9f\u00e9rence \u00a0\u00bb sp\u00e9cifiques par zones g\u00e9ographiques et par type de projets. De l&rsquo;orientation des d\u00e9veloppements m\u00e9thodologiques d\u00e9pendra le champ d&rsquo;application des MDP. Les m\u00e9canismes de d\u00e9veloppement propre risquent, par ailleurs, de concentrer les transferts de fonds sur des projets maximisant le stockage de CO2 (plantations industrielles).<br \/>\nCeci peut se faire au d\u00e9triment de projets plus structurants dans le domaine \u00e9nerg\u00e9tique pour \u00e9viter la d\u00e9rive \u00e0 long terme des \u00e9missions ; dans le domaine forestier ou agroforestier il peut \u00e9vincer des projets \u00a0\u00bb \u00e0 dividendes multiples \u00ab\u00a0, entra\u00eenant des conflits entre plusieurs objectifs environnementaux (notamment avec l&rsquo;objectif de conservation de la biodiversit\u00e9). Ceci motive la recherche de m\u00e9canismes de financement et de s\u00e9lection des projets permettant aux PED d&rsquo;utiliser les MDP pour la r\u00e9alisation de leurs objectifs nationaux de d\u00e9veloppement durable.<\/p>\n<p>Dans la m\u00eame perspective, la recherche des possibilit\u00e9s d&rsquo;articulation et de combinaison d&rsquo;instruments incitatifs pour le d\u00e9veloppement durable (fonds GEF\/FFEM destin\u00e9s \u00e0 couvrir les \u00a0\u00bb co\u00fbts incr\u00e9mentaux \u00ab\u00a0, fiscalit\u00e9 environnementale, \u2026) vise \u00e0 concilier plusieurs objectifs environnementaux et de d\u00e9veloppement.<\/p>\n<div class=\"field field-type-textfield-field-coordination-apr\">\n<table>\n<tbody>\n<tr>\n<td class=\"field-label\">Coordinateur(s)<\/td>\n<td class=\"field-content\">\n<div class=\"field-item odd\">\n<p><a href=\"mailto:alain.karsenty@cirad.fr\" target=\"_blank\" rel=\"noopener\">Alain Karsenty<\/a>, CIRAD &#8211; ECOPOL<br \/>\n<a href=\"mailto:gouvello@centre-cired.fr\" target=\"_blank\" rel=\"noopener\">Christophe De Gouvello<\/a>, CNRS &#8211; CIRED<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"field field-type-textfield-field-partenaire-apr\">\n<table>\n<tbody>\n<tr>\n<td class=\"field-label\">Partenaire(s)<\/td>\n<td class=\"field-content\">\n<div class=\"field-item odd\">\n<p>CIFOR<br \/>\nCIRAD &#8211; ECOPOL<br \/>\nCIRAD &#8211; TERA<br \/>\nCNRS &#8211; CIRED<br \/>\nHarvard Institute for International Development<br \/>\nIndian Institute of Management<br \/>\nLa COPPE<br \/>\nWorld Resources Institute<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"field field-type-textfield-field-financeur-apr\">\n<table>\n<tbody>\n<tr>\n<td class=\"field-label\">Financeur(s)<\/td>\n<td class=\"field-content\">\n<div class=\"field-item odd\">MEDD<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"field field-type-textfield-field-budget-apr\">\n<table>\n<tbody>\n<tr>\n<td class=\"field-label\">Budget<\/td>\n<td class=\"field-content\">\n<div class=\"field-item odd\">83 249.38 \u20ac (including tax)<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>M\u00e9canismes de d\u00e9veloppement propre, politiques et mesures domestiques Fichier(s) attach\u00e9(s) Pr\u00e9sentation ppt Rapport final Rapport final r\u00e9sum\u00e9 L&rsquo;utilisation des m\u00e9canismes de d\u00e9veloppement propre pour le financement d&rsquo;un certain nombre de projets de \u00a0\u00bb puits&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,29,102],"tags":[],"class_list":["post-618","post","type-post","status-publish","format-standard","hentry","category-apr","category-apr-1999","category-les-projets-retenus-fr-apr-1999"],"_links":{"self":[{"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/posts\/618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=618"}],"version-history":[{"count":1,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/posts\/618\/revisions"}],"predecessor-version":[{"id":619,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=\/wp\/v2\/posts\/618\/revisions\/619"}],"wp:attachment":[{"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=618"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.gip-ecofor.org\/gicc\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}